: Multinational machinery. Work
:
cement replacement cover for sandwich panel facade
cement replacement by sheet metal. Replacement of translucent walls
sawtooth.
Location: Arganda del Rey. Madrid.
Materials :
Sandwich Panel Rock Wool 50 mm. Translucent polycarbonate
cell Danpanlon
Prepainted metal facades of 0.6 mm.
Requirements: Make changes and facing deck for technical stop factory. Personal
technical / operational : Closings Palomares. No Subcontractors.
(click to enlarge)
![]() |
Ships with asbestos-cement |
![]() |
asbestos-cement facades |
![]() |
Overview of the facades and roofs to change |
![]() |
cement removal work |
Vista
![]() |
sawtooth roof and walls |
![]() |
Replacement cement cover |
![]() |
Area facades change jobs |
![]() |
cement cover changes by panel |
![]() |
security zone cement collection |
![]() |
Asbestos Decontamination Unit |
![]() |
Collection package with asbestos cement |
![]() |
asbestos fiber cement macroencapsulated |
![]() |
view completed jobs |
![]() |
metal facade and walls of polycarbonate |
0 comments:
Post a Comment